Sundt has completed the concrete work requiring the protection provided by the Bay 1 sheet pile cofferdam. They are ready to begin mobilizing to the next bay.
The first step is to cut down the Bay 1 sheet piling. As a result, the water level just upstream of the dam will likely lower about another two (2) feet from its current level, due to the modified shape of the Bay 1 spillway.
Sundt is expecting to begin cutting the sheet pile down tomorrow, October 23, 2024.
If residents have additional questions regarding the level change, please use the "Contact Us" form to submit your inquiries.